Elecbits Announces it's Series-A Funding Round - Read More
https://elecbits.in/tech-2/
About Us
Solutions
Supply Chain Solutions Component Sourcing PCB Assembly PCB Fabrication Turnkey Solutions Risk and Obsolescence Rapid Prototyping Integrated Testing Engineering Solutions Electronics Consulting PCB Designing Firmware Development Industrial Designing Embedded Testing R&D infra DFMA EB Products Middleware Quality Check & Testing
Manufacturers Careers
Resources
QUALITY & CONSISTENCY Quality standards INSIGHTS Blog
  • Rapid Prototyping
    for Electronics

    Working prototypes in 15-20 days. Full production in 3-4 months instead of the industry-standard 12-18.

    Get a quote
    Rapid

    Rapid
    Prototyping
    for Electronics

    Get a quote
    15-20 Days for POC 4-5× Faster Than Industry Average Prototype to Production Under One Roof
    15-20 Days for POC 4-5× Faster Than Industry Average Prototype to Production Under One Roof 15-20 Days for POC 4-5× Faster Than Industry Average Prototype to Production Under One Roof

    Why Hardware Teams Choose
    Elecbits for Rapid Prototyping

    Most hardware companies spend 12–18 months concept to production.
    Elecbits compresses that to 3–4 months, without compromising quality.

    Industry Average

    Traditional approach, fragmented vendors

    12–18 months total


    Average production timelines:

    POC
    Proof of Concept
    1–6 units
    60–90 days
    EVT
    Eng. Validation
    Batch up to 50
    60–90 days
    DVT
    Design Validation
    Batch up to 200
    90-120 days
    PVT
    Prod. Validation
    Batch up to 500
    60–90 days
    MP
    Mass Production
    Batch up to 1000+
    90-120 days
    Elecbits Timelines

    End-to-end, under one roof

    3–4 months total

    POC
    Proof of Concept
    1–6 units
    15–20 days
    EVT
    Eng. Validation
    Batch up to 50
    15–20 days
    DVT
    Design Validation
    Batch up to 200
    20–25 days
    PVT
    Prod. Validation
    Batch up to 500
    15–20 days
    MP
    Mass Production
    Batch up to 1000+
    Up to 1 Month

    Why Hardware
    Teams Choose Elecbits
    for Prototyping

    Hardware companies take 12–18 months for production. Elecbits reduces this to 3–4 months, maintaining quality.

    Industry Average

    Traditional approach, fragmented vendors

    12–18 months total


    POC
    Proof of Concept
    1–6 units
    60–90 days
    EVT
    Eng. Validation
    Batch up to 50
    60–90 days
    DVT
    Design Validation
    Batch up to 200
    90–120 days
    PVT
    Prod. Validation
    Batch up to 500
    60–90 days
    MP
    Mass Production
    Batch up to 1000+
    90–120 days
    Elecbits Timelines

    End-to-end, under one roof

    3–4 months total

    POC
    Proof of Concept
    1–6 units
    15–20 days
    EVT
    Eng. Validation
    Batch up to 50
    15–20 days
    DVT
    Design Validation
    Batch up to 200
    20–25 days
    PVT
    Prod. Validation
    Batch up to 500
    15–20 days
    MP
    Mass Production
    Batch up to 1000+
    Up to 1 Month

    From your first POC to
    Volume Production runs,

    Elecbits suits any stage of your hardware plan.

    01

    Proof of Concept (POC)

    Validate core ideas in physical form before bigger engineering investment.

    Most common
    02

    Engineering Validation (EVT)

    First functional builds for internal validation before DVT lock.

    Early Stage
    03

    Investor or Customer Demos

    Working hardware for funding rounds, pilots, or product launches.

    High Priority
    04

    Design Iteration

    Multiple variants tested in parallel before locking the final design.

    Iterative
    05

    Market Testing

    Beta builds or regulatory pre-submission samples ahead of mass production.

    Pre-production

    From your first POC to Volume Production runs,

    Elecbits suits any stage of your hardware plan.

    01

    Proof of Concept (POC)

    Validate core ideas in physical form before bigger engineering investment.

    02

    Engineering Validation (EVT)

    First functional builds for internal validation before DVT lock.

    03

    Investor or Customer Demos

    Working hardware for funding rounds, pilots, or product launches.

    04

    Design Iteration

    Multiple variants tested in parallel before locking the final design.

    05

    Market Testing

    Beta builds or regulatory pre-submission samples ahead of mass production.

    What You Get with

    Elecbits
    Rapid Prototyping

    PCB Prototyping

    2 to 12-layer boards. Standard, HDI, and rigid-flex.
    Turnaround as fast as 5 days.

    PCB Assembly

    SMT and through-hole. Components down to 01005, BGA, and fine-pitch capability.

    Component Sourcing

    Live BOM check, alternate parts, and global sourcing powered by Elecbits XOR.

    Firmware Integration

    Flashing, basic bring-up, and integration support included in every prototype build.

    Functional Testing

    AOI, in-circuit, and functional validation before delivery. Boards work when they arrive.

    Enclosure & Mechanical

    3D printing, CNC, and mechanical prototyping coordinated with the electronics build.

    What You Get with Elecbits

    Rapid Prototyping

    We own every stage of your component
    risk management.

    PCB Prototyping

    2 to 12-layer boards. Standard, HDI, and rigid-flex. Turnaround as fast as 5 days.

    PCB Assembly

    SMT and through-hole. Components down to 01005, BGA, and fine-pitch capability.

    Component Sourcing

    Live BOM check, alternate parts, and global sourcing powered by Elecbits XOR.

    Firmware Integration

    Flashing, basic bring-up, and integration support included in every prototype build.

    Functional Testing

    AOI, in-circuit, and functional validation before delivery. Boards work when they arrive.

    Enclosure & Mechanical

    3D printing, CNC, and mechanical prototyping coordinated with the electronics build.

    Configure Your Prototype Build

    Adjust the parameters to get a rough turnaround estimate.
    For an exact quote, share your BOM and Gerber files, our engineers review within 24 hours.

    Build Phase

    POC
    Proof Of Concept
    PVT
    Production Validation
    EVT
    Engineering Validation
    DVT
    Design Validation
    Estimated Turnaround
    15–20 days
    Phase vs. Full Timeline 3–4 months total
    Included in This Build
    Tick Schematic & layout review
    Tick Schematic & layout
    review
    Tick Component sourcing via XOR
    Tick Basic bring-up & functional testing

    Configure Your
    Prototype Build

    Adjust parameters for an estimate. For a quote, share your BOM and Gerber files; engineers review in 24 hours.

    Build Phase

    POC
    Proof Of Concept
    PVT
    Production Validation
    EVT
    Engineering Validation
    DVT
    Design Validation

    Turnaround Preference

    Standard
    Express

    Standard builds include full sourcing checks, lead-time verification, and quality validation.

    Estimated Turnaround
    15–20days
    Phase vs. Full Timeline 3–4 months total

    Faster Builds,
    Lower Project Costs

    Elecbits cuts cost from three sources:

    Faster Builds,
    Lower Project Costs

    Elecbits cuts cost from three sources:

    Our Partners

    Connecting Global Manufacturers for Seamless Innovation

    Our Partners

    Connecting Global Manufacturers for Seamless Innovation

    Start Building Your
    Prototype Today

    From a single board to a fully assembled proof-of-concept, we turn
    concepts into working hardware - fast.

    Start Building Your
    Prototype Today

    From a single board to a working proof-of-concept, we turn concepts into
    hardware fast.

    Upload Your BOM →

    Frequently Asked Questions

    1How fast can I get a working prototype from Elecbits?
    POC builds typically ship in 15-20 days from BOM and Gerber approval. EVT prototypes (up to 50 units) ship in the same window.
    2What design files do I need to share to start a prototype build?
    Gerber files, BOM, and pick-and-place files. If your design is still evolving, our engineers can review preliminary files and flag manufacturability or sourcing issues early.
    3Can you handle prototypes if my BOM isn't finalized?
    Yes. We work with hardware teams at every design stage including BOM finalization. Elecbits XOR helps identify lifecycle risks, alternate components, and sourcing constraints before lock.
    4Do you source hard-to-find or long-lead components for prototypes?
    Yes. Our sourcing team handles global procurement, including obsolete and constrained components. XOR flags supply chain risks early and recommends alternates where needed.
    5 What's the minimum order quantity for a prototype build?
    No fixed minimum. We support builds starting from a single unit for POC, up to 1,000+ units for production runs.
    6Can the same team take my prototype into volume production?
    Yes. The Elecbits team that builds your prototype can take it through DVT, PVT, and mass production without vendor handoffs. That's how we compress 12-18 month timelines into 3-4 months.
    TECH